FEL-3 Equipment Cost Estimator — Lang / Hand Factors · CEPCI Escalation
AACE CLASS 3 ±30% LANG / HAND CEPCI INDEX
Project Basis
Lang factor (f)
4.74
TIC = f × Σ (purchased equipment cost)
Includes installation, piping, civil, instruments, electrical, insulation, painting.
CAPEX Build-up Factors
%
%
%
%
These percentages are applied on top of TIC to build the Total Project Cost (TPC).
Equipment List — Purchased Equipment Costs (PEC)
Enter bare purchased cost at reference CEPCI conditions. The engine applies CEPCI escalation, location factor, and Lang/Hand installation factors automatically.